RASTECH Magazine

News Cleantech Canada News
Dramm facility to run on 90% solar energy

May 2, 2022  By RAStech staff


(Photo: Dramm Corporation)

Dramm Corporation says its headquarters in Manitowoc, Wisconsin now runs on 90 per cent solar energy.

The water systems manufacturer has installed 286 solar panels across 18,000 square foot. The installation is said to produce an annual energy savings of 161,990 kilowatts. The new Dramm headquarters began construction in May 2021. The warehouse is complete and the office building is currently under construction. Completion is scheduled for late summer 2022.

“Dramm Corporation is very excited to include a large solar photovoltaic (PV) array on the site of our new facility,” Hans Dramm, President of Dramm, said. “The panels are dual-sided, which adds to their efficiency by allowing for the collection of photovoltaic energy refracting from the ground and collected from direct contact. It’s all very cool!”

Advertisement

Print this page

Advertisement

Stories continue below


Related

Tags